Thursday, May 6, 2010

Refrigerator, Oven & Microwave

I dont have any preference for refrigerators but it was Paul who insisted to have a big fridge. I wonder why he wants a big fridge so much... to store his drinks??
For microwave, we just bought one which was cheap, with reasonable function (grilling) and white in colour to suit our kitchen.
As for oven, it's sponsored by my mum. Thanks mum! :D

There goes the fridge.

A Complete set of electrical applicances in my dry kitchen.

Friday, March 19, 2010

Washing Machine

When buying a washing machine, one will consider whether to go for a front load or a top load. If you look at all the top load washing machine range, there's plenty of brands and design for you to choose from. As for front load washing machines, the design is pretty conventional and the brands are pretty limited too.
I've always wanted to get a front load instead of a top load. I've been surveying quite a number of washing machines... and the choices are pretty limited due to my criterias.... the capacity should be 7kg or more and preferably the price below 2k.
After surveying for weeks, I've ended up getting the below. :)


Tuesday, March 9, 2010

Wood frame & glass installation

There is only a half wall between the dry kitchen and the wet kitchen. We have 2 options ; either to build a full height wall or to leave it empty and install a glass as a separator. We chose the latter.

Before any work done :- 1st step : Installation of the wood frame. This is done by the contractor.2nd step : Installation of the glass. 3rd step : DIY painting job.
FINALLY When it's 90% DONE.......................



What is the other 10% pending is something to do with the glass. We have not really decided what to do with it yet to make it look better. :)

Monday, February 1, 2010

Installation of cabinets

Painting work is all done. It's time to install my built in cabinets. This is going to be pretty exciting.

The wet kitchen


The dry kitchen. I like this the most :)

The tv cabinet.
The prayers table

Sunday, January 31, 2010

Day 23 to 27 - Painting job

My house renovation is more or less complete except the area between the wet kitchen and the dry kitchen. The pending task is to build a wood frame and install the glass & the sliding door. This job can wait.
So the next activity for my house is painting . I am going to get some contract workers to help me with painting.

Paints cost a bomb. I'm using ICI Dulux for all my internal area and Nippon for all my external area. 1 pail cost more than RM100. Look how many pails I've used.. *Heartache*

Painting the front of my house


Painting the small room
Painting the back of my house

Wednesday, January 27, 2010

Day 22 - Mosaic tiles for my dry kitchen

First, they spread some white cement (It's called white cement gam)


Then, you spread the white cement onto the sheet of the mosaic tiles and stick it on the wall.

Work in progress


All done! :) Looks pretty odd now but I'm sure it will look good when the cabinets are up. Can't wait to see the result.. :D

Monday, January 25, 2010

Day 21 - Installation of front gate

Because of the extension of the front entrance, by right I will have to change to a new gate. To save some $$, I used back the existing gate and just extended it to be longer. :)