Sunday, January 31, 2010

Day 23 to 27 - Painting job

My house renovation is more or less complete except the area between the wet kitchen and the dry kitchen. The pending task is to build a wood frame and install the glass & the sliding door. This job can wait.
So the next activity for my house is painting . I am going to get some contract workers to help me with painting.

Paints cost a bomb. I'm using ICI Dulux for all my internal area and Nippon for all my external area. 1 pail cost more than RM100. Look how many pails I've used.. *Heartache*

Painting the front of my house


Painting the small room
Painting the back of my house

Wednesday, January 27, 2010

Day 22 - Mosaic tiles for my dry kitchen

First, they spread some white cement (It's called white cement gam)


Then, you spread the white cement onto the sheet of the mosaic tiles and stick it on the wall.

Work in progress


All done! :) Looks pretty odd now but I'm sure it will look good when the cabinets are up. Can't wait to see the result.. :D

Monday, January 25, 2010

Day 21 - Installation of front gate

Because of the extension of the front entrance, by right I will have to change to a new gate. To save some $$, I used back the existing gate and just extended it to be longer. :)


Friday, January 22, 2010

Day 18 - 20 : Tiling works (Living hall)

The last major work : Tiling.


Cutting the tiles to the correct size for the sides


All done. Finally! This took them 3 days to complete the whole area.

Tuesday, January 19, 2010

Day 17 - Installing plaster ceiling

My back kitchen is done. So the last piece of work that the contractor needs to do is to tile my living hall. That can only be done if my plaster ceiling is up.


So, we've arranged for the plaster ceiling to be completed first.

Plastering my porch area.

Touching up on the plaster ceiling in the rooms

The most expensive area --> Dining area. These boxes cost a bomb even though there are only 6 of them. When lights are installed I'm sure it will look really comforting due to the concealed lighting.

Day 16 - Tiling Kitchen Slab

I thought the tiling of the kitchen slab was easy but it was not. This took them 1 whole day to complete.

I've also installed the back metal door.


Monday, January 18, 2010

Day 14 & 15 - Tiling Back extension

This is exciting. Tiling work for my wet kitchen.

Laying the wall tiles

All done now :D I like my wet kitchen.

Have added in the sink too.

Sunday, January 17, 2010

Day 13 - Renovation continues @ Front porch

Tiling the front porch area. This area was not tiled earlier as it meant for you to do some gardening. I'm giving gardening up. No one wants to do the weeding...


All done! Nice!

My new pillar is done too. :)

Tuesday, January 12, 2010

Day 12 - Kitchen Slab @ Wet kitchen

At first, they just put up some sort of wood planks for the shape of the slab





Then, they put the cement slab up.

Sunday, January 10, 2010

Day 11 - Back extension & Front gate

My back extension's floor is completed today. Will have to wait till it's dry to proceed with the next step which is tiling. Can't wait for my tiles to be up.




They are starting to build the new gate pillar.





Friday, January 1, 2010

Day 10 : Renovation continues

They've removed my front pillar entirely.


I have a slab built just in front of the new pillar which will be ready real soon.


Updates to what's happening inside the house. They've completed with the removal of the hall tiles.