Thursday, May 6, 2010
Refrigerator, Oven & Microwave
I dont have any preference for refrigerators but it was Paul who insisted to have a big fridge. I wonder why he wants a big fridge so much... to store his drinks??
For microwave, we just bought one which was cheap, with reasonable function (grilling) and white in colour to suit our kitchen.
As for oven, it's sponsored by my mum. Thanks mum! :D
For microwave, we just bought one which was cheap, with reasonable function (grilling) and white in colour to suit our kitchen.
As for oven, it's sponsored by my mum. Thanks mum! :D
Friday, March 19, 2010
Washing Machine
When buying a washing machine, one will consider whether to go for a front load or a top load. If you look at all the top load washing machine range, there's plenty of brands and design for you to choose from. As for front load washing machines, the design is pretty conventional and the brands are pretty limited too.
I've always wanted to get a front load instead of a top load. I've been surveying quite a number of washing machines... and the choices are pretty limited due to my criterias.... the capacity should be 7kg or more and preferably the price below 2k.
After surveying for weeks, I've ended up getting the below. :)
I've always wanted to get a front load instead of a top load. I've been surveying quite a number of washing machines... and the choices are pretty limited due to my criterias.... the capacity should be 7kg or more and preferably the price below 2k.
After surveying for weeks, I've ended up getting the below. :)
Tuesday, March 9, 2010
Wood frame & glass installation
There is only a half wall between the dry kitchen and the wet kitchen. We have 2 options ; either to build a full height wall or to leave it empty and install a glass as a separator. We chose the latter.
Before any work done :- 1st step : Installation of the wood frame. This is done by the contractor.2nd step : Installation of the glass. 3rd step : DIY painting job.
FINALLY When it's 90% DONE.......................
What is the other 10% pending is something to do with the glass. We have not really decided what to do with it yet to make it look better. :)
Monday, February 1, 2010
Installation of cabinets
Sunday, January 31, 2010
Day 23 to 27 - Painting job
My house renovation is more or less complete except the area between the wet kitchen and the dry kitchen. The pending task is to build a wood frame and install the glass & the sliding door. This job can wait.
So the next activity for my house is painting . I am going to get some contract workers to help me with painting.
Paints cost a bomb. I'm using ICI Dulux for all my internal area and Nippon for all my external area. 1 pail cost more than RM100. Look how many pails I've used.. *Heartache*
Painting the small room
So the next activity for my house is painting . I am going to get some contract workers to help me with painting.
Paints cost a bomb. I'm using ICI Dulux for all my internal area and Nippon for all my external area. 1 pail cost more than RM100. Look how many pails I've used.. *Heartache*
Painting the front of my house
Painting the small room
Wednesday, January 27, 2010
Day 22 - Mosaic tiles for my dry kitchen
First, they spread some white cement (It's called white cement gam)
Monday, January 25, 2010
Day 21 - Installation of front gate
Friday, January 22, 2010
Day 18 - 20 : Tiling works (Living hall)
Tuesday, January 19, 2010
Day 17 - Installing plaster ceiling
My back kitchen is done. So the last piece of work that the contractor needs to do is to tile my living hall. That can only be done if my plaster ceiling is up.
So, we've arranged for the plaster ceiling to be completed first.
Plastering my porch area.
Touching up on the plaster ceiling in the rooms
The most expensive area --> Dining area. These boxes cost a bomb even though there are only 6 of them. When lights are installed I'm sure it will look really comforting due to the concealed lighting.
Day 16 - Tiling Kitchen Slab
Monday, January 18, 2010
Sunday, January 17, 2010
Day 13 - Renovation continues @ Front porch
Tuesday, January 12, 2010
Day 12 - Kitchen Slab @ Wet kitchen
At first, they just put up some sort of wood planks for the shape of the slab
Then, they put the cement slab up.
Then, they put the cement slab up.